In 2022, upon completion of construction, it is possible to reduce the loading of the road network, mainly due to the redistribution of flows. Redistribution of flows is ensured by the following project solutions:
• development of the street network in accordance with the City Master Plan of the city of Perm;
• development of a tram network in accordance with the City Master Plan of the city of Perm and the Local Norms of Urban Design in the city of Perm;
• development of tram and street-road network in accordance with the design solutions provided for in the draft planning of the territory «Bakharevka»;
• Reduction of traffic intervals on a suburban railway and tram network, taking into account tramway traffic along a dedicated lane.
As a result of the analysis of the future loading of the road network, several problem areas that require detailed study were identified.